We visited the site over the weekend and paint work has commenced. There were two guys working away at our walls and internal doors. Looked like they had got through a fair bit of work, not sure when they started since they didn't have too much english. One of them was kind enough to show us the other paint that they were going to use which was the 'Crisp White' colour we had chosen for the cornices, architraves and door linings.
Seems everything is on track for the dates mentioned by the SS. We will see how things progress in the coming weeks. Biggest work left would probably be the driveway and portico paving as well as the driveway cross-over.
From the inside we also noticed that the feature tile strip in the ensuite doesn't go all the way to the top. However, the main bathroom feature tiles go all the way. I checked our paperwork and there's no specific mention of the feature tile not going all the way. So will be pointing this out to SS.