Monday 17 February 2014

PCI

Had our PCI today. It went surprisingly smooth. Had a list with me which was shared on the home one forums. Most of the issues were relating to paint and plasterboard. Nothing really major. 
The one to point out again was the feature tile in the ensuite which they ran out of and haven't fixed yet. SS took a note and sent email.

Basin in WC also still outstanding. Painters and silicon guys will still need to complete some marked areas.

Howards will be doing their inspection tomorrow. Tyrells apparently coming in today. Will be interesting to see the reports.


















Sunday 2 February 2014

Electricals & Fittings

Visited the home on another very hot day yesterday. House is now securely locked and no entry is possible. We had a quick look through the windows and saw that all our electrical connections had been done. The plugs for TVs are looking great. The lights have also been fitted with small bulbs, also outside powepoint is there. Gas points are where they are supposed to be.

Bathrooms are also looking good. Semi frameless showers look a lot better than I remember them. I thought they would have more of a frame but most of frame is up the top and bottom. Tap fittings are also looking good. Didn't get to see the WC basin and tap (this was an addition), hoping that has been installed too.
It is really starting to look like a home now.

From our calculations we seem to only have the following left before PCI.

1. Carpets
2. Flyscreens
3. Driveway & portico