Sunday 2 February 2014

Electricals & Fittings

Visited the home on another very hot day yesterday. House is now securely locked and no entry is possible. We had a quick look through the windows and saw that all our electrical connections had been done. The plugs for TVs are looking great. The lights have also been fitted with small bulbs, also outside powepoint is there. Gas points are where they are supposed to be.

Bathrooms are also looking good. Semi frameless showers look a lot better than I remember them. I thought they would have more of a frame but most of frame is up the top and bottom. Tap fittings are also looking good. Didn't get to see the WC basin and tap (this was an addition), hoping that has been installed too.
It is really starting to look like a home now.

From our calculations we seem to only have the following left before PCI.

1. Carpets
2. Flyscreens
3. Driveway & portico

3 comments:

  1. Wow, great to know you home is taking its complete form and soon you will be moving into your new dream home. Please upload more photos when you get a chance, particularly of the shower screen. We are having a semi-frameless shower screen (integrity series) for a house yet to be started. Our current semi-frameless screen is a bit chunky at the bottom and one of the sides (where the door closes).
    Not sure which model EB has used.
    All the best, NeilP

    ReplyDelete
  2. Hi muzzy which side of the Edmondson park you're building, Camden valley way or the M5 side

    ReplyDelete