We finally met our SS for the first time face to face today. Really nice guy. He walked us through the house and even gave us a tip with the recycled water. Also the really good news is that he again confirmed that the alfresco door can be flipped over so that it opens the other way. The only thing he mentioned is that there may be a few extra holes in the stacker frame due to the switch but they will fill those up with paddy. So not a huge deal. The stacker door will be flipped when the Stegbar guys come install our flyscreens.
On another note the H&K Ryan guy came for an inspection in the morning at 6am. This one is for the first inspection for 'lockup' phase. We received the report this afternoon and please to see that there were no major things that needed fixing. Most of them were parts of the frame that needed to be secured to slab, alignment and straightening of cavity door frames, adding mortar to bricks after clean etc. I'll provide a summary of the finding of both Tyrells and H&K Ryan reports in a seperate post.
All in all quite happy with how the lockup stage has been achieved. Now we are starting a new phase which will involve all the fine details like internal linings, paintwork, finishings etc. We asked SS when he thought we would be settled but he said that he needs to check the schedule and get back to us. It all depends on who is available after the xmas break. He may need to shuffle things depending on who is available.